Gwinnett Index

Duluth UDC § 1015.02

Bedding, Structural Backfill and Final Backfill

Governing jurisdiction
Duluth

Land inside these city limits is governed by Duluth's own code and boards. A "Duluth, GA" mailing address is not proof of being inside them — most such addresses fall in unincorporated Gwinnett.

Boundary: US Census TIGERweb (Incorporated Places, ACS 2025 vintage), vintage 2025.

Article
10 — Erosion Control and Stormwater Management
Pages in source
280
Adopted
2025-09-08
Amended through
2026-07-13
Source
Adopted PDF

Text

1. At the time of Development Application the Applicant for a Development Permit shall specify which pipe materials will be used and will identify the bedding and backfill detail that will be used for each pipe. 2. Construction Loads and Minimum Covers. When drainage pipe is installed prior to the completion of grading, a minimum of 4 feet of fill shall be provided where needed to adequately protect the drainage structure during the land development phase, unless the structure itself is designed to withstand the anticipated live load during construction. 3. Junction Boxes and Catch Basins. a. Catch basins and drop inlets shall be constructed in accordance with GDOT Standards. Junction boxes shall be in accordance with GDOT Standards 1011a or 1011ap. All catch basins and junction boxes in non-traffic areas shall have metal manhole frames and lids. In roadways or areas subject to vehicles, manhole castings shall be in accordance with GDOT Standard 1011a. b. All junction boxes shall extend to the ground surface. Buried or blind junction boxes are prohibited. 4. Other Structures. Natural bottom arches and box culverts may be used in accordance with the latest Standard Specifications of the Georgia Department of Transportation. 5. Storm Sewer As-Builts. Prior to Final Plat approval or issuance of a Certificate of Occupancy, the Applicant for a Development Permit shall submit a “Storm Sewer As-Built”. The as-built shall show details of compliance with this specification.