Duluth UDC § 912.03
Nonresidential Subdivision or Development Streets
Governing jurisdiction
Duluth
Land inside these city limits is governed by Duluth's own code and boards. A "Duluth, GA" mailing address is not proof of being inside them — most such addresses fall in unincorporated Gwinnett.
Boundary: US Census TIGERweb (Incorporated Places, ACS 2025 vintage), vintage 2025.
- Article
- 9 — Project Design and Construction Standards
- Pages in source
- 258
- Adopted
- 2025-09-08
- Amended through
- 2026-07-13
- Source
- Adopted PDF
Text
The following types of base materials may be used:
1. Asphalt Streets:
a. Crushed Stone Base
i. The base course shall consist of at least 8 inches of compacted and graded aggregate
base. After being thoroughly compacted and brought to proper section, 4 inches of 19
mm Superpave binder course shall be applied. Industrial uses may require a thicker GAB
layer as directed by the City.
ii. If a delay in paving is reasonably expected by the Developer or the Department, the
base shall be primed with 0.25 gallon of R.C. 70 per square yard the same day it is
compacted and cured for 7 days prior to paving.
iii. The final 2 inches of 9.5 mm Superpave surface course shall be applied after 90% of the
buildings on the street have been built, or prior to the end of the maintenance period
(but after the 11th month), whichever occurs first.
iv. Prior to applying surface course, a tack coat shall be applied to the binder course at a
rate of no less than 0.05 gallons per square yard. Type of tack shall be approved by the
Planning and Development Department prior to placement.
b. Soil Cement Base.
i. If the base material (residential soil) is unsatisfactory to the Planning and Development
Department then a soil cement mix design with engineering test results acceptable to
the Department. The design must come from a geo-technical firm with the results
certified by a Professional Engineer registered in the State of Georgia. The tests required
for the design are ASTM D558 or AASHTO T134 or ASTM D559 and/or 560 or AASHTO
T135 and 136.
ii. The minimum base course shall consist of at least 8 inches of suitable soil (high mica
content not suitable) stabilized with 10% of Portland Cement by volume (approximately
42.3 pounds per sq. yd.).
2. Concrete Streets: Shall be designed by a geotechnician