Duluth UDC § 803.02
Variance Procedures
Governing jurisdiction
Duluth
Land inside these city limits is governed by Duluth's own code and boards. A "Duluth, GA" mailing address is not proof of being inside them — most such addresses fall in unincorporated Gwinnett.
Boundary: US Census TIGERweb (Incorporated Places, ACS 2025 vintage), vintage 2025.
- Article
- 8 — Environmental Protection
- Pages in source
- 216–218
- Adopted
- 2025-09-08
- Amended through
- 2026-07-13
- Source
- Adopted PDF
Text
Variance requests from the requirements of this Code Division shall be submitted on an application form as
prescribed by the Planning and Development Director or the director’s designee, along with such fees as shall be
established by the Mayor and City Council. The Planning and Development Director or the director’s designee shall
coordinate the review of each variance request with all other affected City of Duluth departments and shall
forward such comments or recommendations as may be received to the Zoning Board of Appeals for action in their
normal course of business. The review must include a recommendation from the Planning and Development
Department.
This section describes how to apply for a variance from this Code Division, however any activity within a state
waters’ buffer must meet State requirements.
1. Variances may be granted in accordance with the following provisions:
a. The project involves the construction of one single family home for residential use by the owner
of the subject property on a parcel that was platted prior to the effective date of this Code
Division, and its shape, topography or other existing physical condition prevents land
development consistent with this Code Division, and the Planning and Development Department
finds and determines that the requirements of this Code Division prohibit the otherwise lawful
use of the property by the owner, the Zoning Board of Appeals may grant a variance from the
buffer and setback requirements hereunder, provided such variance requires mitigation
measures to offset the effects of any proposed land development on the parcel. The Zoning
Board of Appeals is authorized to use a consent agenda to fulfill the terms of this Subsection.
b. Except as provided above, the Zoning Board of Appeals shall grant no variance from any
provision of this Code Division without first conducting a public hearing on the application for
variance and authorizing the granting of the variance by an affirmative vote of the Board. The
Planning and Development Department shall follow the Public Hearing, or “notice”,
requirements for a variance to be heard by the Zoning Board of Appeals as provided in the
Procedures and Permits Article of this UDC. No application or reapplication for a variance
affecting the same stream segment on a property shall be heard within 12 months from the date
of last action by the Zoning Board of Appeals unless such 12-month period is waived by the
Zoning Board of Appeals, and in no case may such application or reapplication be reconsidered in
less than six months from the date of last action by the Zoning Board of Appeals.
2. Variances will not be considered when, following adoption of this Code Division, actions of any property
owner of a given property have created conditions of a hardship on that property.
3. Variances will be considered only in the following cases:
a. The applicant provides evidence that impacts to the buffer have been avoided or minimized to
the fullest extent practicable; and
b. The project involves the construction or repair of a structure that, by its nature, must be located
within the buffer. Such structures include dams and detention/retention ponds; or
c.
Paved recreational foot trails and viewing areas, providing that impacts to the buffer are
minimal; or
d. The proposed land disturbing activity within the buffer will receive a permit from the United
States Army Corps of Engineers (USACE) under Section 404 of the federal Water Pollution Control
Act Amendment of 1972, 33 U.S.C. Section 1344, and the Corps of Engineers has received a
mitigation plan to be implemented as a condition of such a permit. In addition, land disturbing
activities in the buffer that are outside the USACE’s jurisdiction must be mitigated; or
215 | P a g e
Article Eight. Environmental Protection
e. The buffer intrusion is mitigated using the procedure established in the Georgia Stormwater
Management Manual, latest edition; or
f.
A valid and complete application for rezoning of the property is submitted prior to the effective
date of this Code Division and approval of the rezoning by the Mayor and City Council occurs
after the effective date of this Code Division application, and the variance request is consistent
with the intent of this Code Division factoring into account the property owner's reliance on
standards in effect at the time of the rezoning.
4. At a minimum, a variance request shall include the following information:
a. A site map that includes locations of all streams, wetlands, floodplain boundaries and other
natural features, as determined by field survey;
b. A description of the shape, size, topography, slope, soils, vegetation and other physical
characteristics of the property;
c.
A dated site plan that shows the locations of all existing and proposed structures and other
impervious cover, the limits of all existing and proposed land disturbance, both inside and
outside the buffer and setback. The exact area of the buffer to be affected shall be accurately
and clearly indicated;
d. Documentation that impacts to the buffer have been avoided or minimized to the fullest extent
practicable;
e. A calculation of the total area and length of the proposed intrusion;
f.
A stormwater management site plan, if applicable;
g.
Proposed mitigation, if any, for the intrusion. If no mitigation is proposed, the request must
include an explanation of why none is being proposed;
h. A description of the project, with details of the buffer disturbance, including estimated length of
time for the disturbance and justification for why the disturbance is necessary;
i.
Any other reasonable information related to the project that the Planning and Development
Department may deem necessary to effectively evaluate the variance request;
j.
A copy of the permit application, supporting documentation, and proposed mitigation plan as
submitted to the United States Army Corps of Engineers under Section 404 of the federal Water
Pollution Control Act Amendment of 1972, 33 U.S.C. Section 1344, if applicable;
k.
A copy of the permit application, supporting documentation, and proposed mitigation plan as
submitted to the Georgia Environmental Protection Division for a variance from the state waters’
buffer; and
l.
A buffer mitigation plan in accordance with the procedure outlined in the Georgia Stormwater
Management Manual.
5. The following factors will be considered in determining whether to issue a variance:
a. The shape, size, topography, slope, soils, vegetation and other physical characteristics of the
property;
b. The locations of all streams on the property, including along property boundaries as determined
from field inspection;
c.
The location and extent of the proposed buffer or setback intrusion; and,
d. Whether alternative designs are possible which require less intrusion or no intrusion;
e. The long-term and construction water-quality impacts of the proposed variance;
f.
Whether issuance of the variance is at least as protective of natural resources and the
environment;
g.
The value of mitigation activities as calculated in accordance with the Georgia Stormwater
Management Manual, latest edition.
216 | P a g e
Article Eight. Environmental Protection