Gwinnett Index

Duluth UDC § 1125.01

Initial Activities Required

Governing jurisdiction
Duluth

Land inside these city limits is governed by Duluth's own code and boards. A "Duluth, GA" mailing address is not proof of being inside them — most such addresses fall in unincorporated Gwinnett.

Boundary: US Census TIGERweb (Incorporated Places, ACS 2025 vintage), vintage 2025.

Article
11 — Procedures and Permits
Pages in source
335–336
Adopted
2025-09-08
Amended through
2026-07-13
Source
Adopted PDF

Text

1. Required erosion control measures must be installed where practical by the developer and inspected by the original engineer at the seven-day visit and approved by the Planning and Development Department prior to actual grading or removal of vegetation. All control measures shall be in place as soon after the commencement of activities as possible and in coordination with the progress of the project. 2. Soil sedimentation facilities must be installed and operational prior to major grading operations. 3. Areas required to be undisturbed by this Development Code, conditions of zoning approval, Metropolitan River Protection Act or other ordinance or regulation shall be designated by survey stakes, flags, or other 334 | P a g e Article Eleven. Procedures and Permits appropriate markings and shall be inspected and approved by the Department of Planning and Development prior to the commencement of any clearing or grading activities.