Text
Subject to the applicability criteria in Section 1020.02 and exemptions in Section 1020.03, the following
stormwater management standards apply. Additional details for each standard can be found in the GSMM Section
2.2.2.2:
1. Design of Stormwater Management System: The design of the stormwater management system shall be
in accordance with the applicable sections of the GSMM as directed by the Administrator. Any design
which proposes a dam shall comply with the Georgia Safe Dams Act and Rules for Dam Safety as
applicable.
2. Natural Resources Inventory: Site reconnaissance and surveying techniques shall be used to complete a
thorough assessment of existing natural resources, both terrestrial and aquatic, found on the site.
Resources to be identified, mapped, and shown on the Stormwater Management Plan, shall include, at a
minimum (as applicable):
a. Topography (minimum of 2-foot contours) and Steep Slopes (i.e., Areas with Slopes Greater Than
15%),
b. Natural Drainage Divides and Patterns,
c.
Natural Drainage Features (e.g., swales, basins, depressional areas),
d. Natural feature protection and conservation areas such as wetlands, lakes, ponds, floodplains,
stream buffers, drinking water wellhead protection areas and river corridors,
e. Predominant soils (including erodible soils and karst areas), and
f.
Existing predominant vegetation including trees, high quality habitat and other existing
vegetation.
3. Better Site Design Practices for Stormwater Management: Stormwater management plans shall preserve
the natural drainage and natural treatment systems and reduce the generation of additional stormwater
runoff and pollutants to the maximum extent practicable. Additional details can be found in the GSMM
Section 2.3.
4. Stormwater Runoff Quality/Reduction: Stormwater Runoff Quality/Reduction shall be provided by using
the following:
283 | P a g e
Article Ten. Erosion Control and Stormwater Management
a. For development with a stormwater management plan, the applicant shall choose (A) Runoff
Reduction and additional water quality shall not be required. To the extent (iA) Runoff Reduction
has been determined to be infeasible for all or a portion of the site using the Practicability Policy,
then (iiB) Water Quality shall apply for the remaining runoff from a 1.2 inch rainfall event and
must be treated to remove at least 80% of the calculated average annual post-development total
suspended solids (TSS) load or equivalent as defined in the GSMM.
i. Runoff Reduction - The stormwater management system shall be designed to retain the
first 1.0 inch of rainfall on the site using runoff reduction methods, to the maximum
extent practicable.
ii. Water Quality – The stormwater management system shall be designed to remove at
least 80% of the calculated average annual post-development total suspended solids
(TSS) load or equivalent as defined in the GSMM for runoff from a 1.2 inch rainfall event.
b. If a site is determined to be a hotspot as detailed in Section 1020.02, the City of Duluth may
require the use of specific or additional components for the stormwater management system to
address pollutants of concern generated by that site.
5. Stream Channel Protection: Stream channel protection shall be provided by using all of the following
three approaches:
a. 24-hour extended detention storage of the 1-year, 24-hour return frequency storm event;
b. Erosion prevention measures, such as energy dissipation and velocity control; and
c.
Preservation of any applicable stream buffer.
6. Overbank Flood Protection: Downstream overbank flood protection shall be provided by controlling the
post-development peak discharge rate to the pre-development rate for the 25-year, 24-hour storm event.
7. Extreme Flood Protection: Extreme flood protection shall be provided by controlling the 100-year, 24-
hour storm event such that flooding is not exacerbated.
8. Downstream Analysis: Due to peak flow timing and runoff volume effects, some structural components of
the stormwater management system fail to reduce discharge peaks to pre-development levels
downstream from the site. A downstream peak flow analysis shall be provided to the point in the
watershed downstream of the site or the stormwater management system where the area of the site
comprises 10% of the total drainage area in accordance with Section 3.1.9 of the GSMM. This is to help
ensure that there are minimal downstream impacts from development on the site. The downstream
analysis may result in the need to resize structural components of the stormwater management system.
9. Stormwater Management System Inspection and Maintenance: The components of the stormwater
management system that will not be dedicated to and accepted by the City of Duluth, including all
drainage facilities, best management practices, credited conservation spaces, and conveyance systems,
shall have an inspection and maintenance agreement to ensure that they continue to function as
designed. All new development and redevelopment sites are to prepare a comprehensive inspection and
maintenance agreement for the on-site stormwater management system. This plan shall be written in
accordance with the requirements in Section 1024.02.