Duluth UDC § 1020.03
Exemptions from Stormwater Management Standards
Governing jurisdiction
Duluth
Land inside these city limits is governed by Duluth's own code and boards. A "Duluth, GA" mailing address is not proof of being inside them — most such addresses fall in unincorporated Gwinnett.
Boundary: US Census TIGERweb (Incorporated Places, ACS 2025 vintage), vintage 2025.
- Article
- 10 — Erosion Control and Stormwater Management
- Pages in source
- 283–284
- Adopted
- 2025-09-08
- Amended through
- 2026-07-13
- Source
- Adopted PDF
Text
This Article does not apply to the following activities:
1. Land disturbing activity conducted by local, state, authority, or federal agencies, solely to respond to an
emergency need to protect life, limb, or property or conduct emergency repairs;
282 | P a g e
Article Ten. Erosion Control and Stormwater Management
2. Land disturbing activity that consists solely of cutting a trench for utility work and related pavement
replacement;
3. Land disturbing activity conducted by local, state, authority, or federal agencies, whose sole purpose is to
implement stormwater management or environmental restoration;
4. Repairs to any stormwater management system deemed necessary by the administrator;
5. Agricultural practices as described O.C.G.A. 12-7-17(5) within areas zoned for these activities with the
exception of buildings or permanent structures that exceed the threshold in [Y]-5 (1) or (2);
6. Silvicultural land management activities as described O.C.G.A. 12-7-17(6) within areas zoned for these
activities with the exception of buildings or permanent structures that exceed the threshold in [Y]-5 (1) or
(2);
7. Installations or modifications to existing structures solely to implement Americans with Disabilities Act
(ADA) requirements, including but not limited to elevator shafts, handicapped access ramps and parking,
and enlarged entrances or exits; and
8. Linear transportation projects being constructed by the City of Duluth to the extent the administrator
determines that the stormwater management standards may be infeasible to apply, all or in part, for any
portion of the linear transportation project. For this exemption to apply, an infeasibility report that is
compliant with the City of Duluth’s linear feasibility program shall first be submitted to the administrator
that contains adequate documentation to support the evaluation for the applicable portion(s) and any
resulting infeasibility determination, if any, by the administrator.