Gwinnett Index

Duluth UDC § 1016.04

Energy Dissipation Design for Piped Systems and Culverts

Governing jurisdiction
Duluth

Land inside these city limits is governed by Duluth's own code and boards. A "Duluth, GA" mailing address is not proof of being inside them — most such addresses fall in unincorporated Gwinnett.

Boundary: US Census TIGERweb (Incorporated Places, ACS 2025 vintage), vintage 2025.

Article
10 — Erosion Control and Stormwater Management
Pages in source
281
Adopted
2025-09-08
Amended through
2026-07-13
Source
Adopted PDF

Text

1. The maximum developed condition flow velocity at the project site's downstream property line adjoining another property shall not exceed the maximum pre-developed condition’s velocity. Calculations may be required to support this velocity standard on a case-by-case basis. 2. Energy dissipation devices, such as splash pads, rip-rap, stilling basins, etc., shall be provided at the outlet of every culvert and piped collection system. Velocity protection shall be in accordance with the Georgia Stormwater Management Manual. Velocities for the fully developed 25-year flow shall not exceed the non-erosive velocity as shown in the Georgia Stormwater Management Manual for the receiving conveyance. Details and all calculations must be submitted with the Development Plans. 3. Energy dissipation devices shall be located entirely within the project site and shall not encroach upon any required buffer. 4. When uniform, graded stone rip-rap is used for energy dissipation, ultraviolet resistant filter fabric (200- pound test) shall be used between the stone layers.