title: Duluth UDC § 837.02 — Duluth
jurisdiction: duluth
governing_jurisdiction: Duluth
source_url: "https://www.duluthga.net/UDC_ADOPTED_9.8.2025_Amended_7-13-26.pdf"
effective_date: "2026-07-13"
as_of: "2026-08-13"
canonical: "https://www.gwindex.net/code/duluth/837.02"
licence: "CC0-1.0"
---

# Duluth UDC § 837.02

Building Standards for Structures and Buildings within the Future-Conditions Floodplain

**Governing jurisdiction: Duluth.** A "Duluth, GA" mailing address is usually NOT in the City of Duluth. Unincorporated Gwinnett is 67.3% of the county's land area and is governed by a different code, a different board and a different permit portal. Resolve the governing jurisdiction before answering any zoning question.


- **Article:** 8 — Environmental Protection
- **Pages in source:** 239–241
- **Adopted:** 2025-09-08
- **Amended through:** 2026-07-13
- **Source:** https://www.duluthga.net/UDC_ADOPTED_9.8.2025_Amended_7-13-26.pdf

## Text

The following provisions, in addition to those in Section 837.01, shall apply:

1. Residential Buildings.
a. New Construction. New construction of principal buildings, including manufactured homes shall

not be allowed within the limits of the future-conditions floodplain unless all requirements of
Sections 836.03, 836.04 and 836.05 have been met. If all of the requirements of Sections 836.03,
836.04 and 836.05 have been met, all new construction shall have the lowest floor, including
basement, elevated no lower than 3 feet above the base flood elevation or 1 foot above the
future-conditions flood elevation, whichever is higher. Should solid foundation perimeter walls
be used to elevate the structure, openings sufficient to equalize the hydrologic flood forces on
exterior walls and to facilitate the unimpeded movements of floodwaters shall be provided in
accordance with standards of Section 837.01(5).
b. Substantial Improvements. Substantial improvement of any principal structure or manufactured

home shall have the lowest floor, including basement, elevated no lower than 3 feet above the
base flood elevation or 1 foot above the future-conditions flood elevation, whichever is higher.
Should solid foundation perimeter walls be used to elevate a structure, openings sufficient to
equalize the hydrologic flood forces on exterior walls and to facilitate the unimpeded
movements of flood waters shall be provided in accordance with standards of Section 837.01(5).
2. Nonresidential Buildings.
a. New Construction. New construction of principal non-residential structures shall not be allowed

within the limits of the future-conditions floodplain unless all requirements of Sections 836.03,
836.04 and 836.05 have been met. If all of the requirements of Sections 836.03, 836.04 and
836.05 have been met, all new construction shall have the lowest floor, including basement,
elevated no lower than 1 foot above the base flood elevation or at least as high as the future-
conditions flood elevation, whichever is higher. Should solid foundation perimeter walls be used
to elevate the structure, openings sufficient to automatically equalize the hydrostatic flood
forces on exterior walls shall be provided in accordance with standards of 837.01(5)(a). New
construction of principal buildings, including manufactured homes shall not be allowed within
the limits of the future-conditions floodplain unless all requirements of Sections 836.03, 836.04
and 836.05 have been met. New construction that has met all of the requirements of Sections
836.03, 836.04 and 836.05 may be floodproofed in lieu of elevation. The structure, together with
attendant utility and sanitary facilities, must be designed to be watertight to 1 foot above the
base flood elevation, or at least as high as the future-conditions flood elevation, whichever is
higher, with walls substantially impermeable to the passage of water and structural components
having the capability of resisting hydrostatic and hydrodynamic loads and the effect of buoyancy.
A registered professional engineer or architect shall certify that the design and methods of
construction are in accordance with accepted standards of practice for meeting the provisions
above and shall provide such certification to the Planning and Development Director using the
FEMA Floodproofing Certificate along with the design and operation/maintenance plan.

238 | P a g e

Article Eight. Environmental Protection

b. Substantial Improvements. Substantial improvement of any principal non-residential structure

located in A1-30, AE, or AH zones, may be authorized by the Planning and Development Director
to be flood-proofed in lieu of elevation. The structure, together with attendant utility and
sanitary facilities, must be designed to be water tight to 1 foot above the base flood elevation, or
at least as high as the future-conditions flood elevation, whichever is higher, with walls
substantially impermeable to the passage of water, and structural components having the
capability of resisting hydrostatic and hydrodynamic loads and the effect of buoyancy. A
registered professional engineer or architect shall certify that the design and methods of
construction are in accordance with accepted standards of practice for meeting the provisions
above and shall provide such certification to the Planning and Development Director using the
FEMA Floodproofing Certificate along with the design and operation/maintenance plan.
c.
Accessory Structures and Facilities. Accessory structures and facilities (i.e., barns, sheds, gazebos,
detached garages, parking lots, recreational facilities and other similar non-habitable structures
and facilities) which are allowed to be located within the limits of the floodplain shall be
constructed of flood-resistant materials and designed to pass all floodwater in accordance with
Section 837.01(5) and be anchored to prevent flotation, collapse or lateral movement of the
structure.
d. Standards for Recreational Vehicles. All recreational vehicles placed on sites must either:

i. Be on the site for fewer than 180 consecutive days and be fully licensed and ready for

highway use, (a recreational vehicle is ready for highway use if it is licensed, on its
wheels or jacking system, attached to the site only by quick disconnect type utilities and
security devices, and has no permanently attached structures or additions); or
ii. The recreational vehicle must meet all the requirements for residential buildings—

substantial improvements, subsection (a)(2), including the anchoring and elevation
requirements.
e. Standards for Manufactured Homes.

i. New manufactured homes shall not be allowed to be placed within the limits of the

future-conditions floodplain unless all requirements of Sections 836.03, 836.04 and
836.05 have been met. If all of the requirements of Sections 836.03, 836.04 and 836.05
have been met, all new construction and substantial improvement shall have the lowest
floor, including basement, elevated no lower than 3 feet above the base flood elevation
or 1 foot above the future-conditions flood elevation, whichever is higher. Should solid
foundation perimeter walls be used to elevate the structure, opening sufficient to
automatically equalize the hydrostatic flood forces on exterior walls shall be provided in
accordance with standards of Section 837.01(5)(a).
ii. Manufactured homes placed and/or substantially improved in an existing manufactured

home park or subdivision shall be elevated so that either:

1. The lowest floor of the manufactured home is elevated no lower than 3 feet
above the level of the base flood elevation, or 1 foot above the future-
conditions flood elevation, whichever is higher; or
2. The manufactured home chassis is elevated and supported by reinforced piers
(or other foundation elements of at least an equivalent strength) of no less
than 36 inches in height above grade.
iii. All manufactured homes must be securely anchored to an adequately anchored

foundation system to resist flotation, collapse and lateral movement in accordance with
standards of Section 837.01(7).

239 | P a g e

Article Eight. Environmental Protection