# Duluth UDC § 825

Protection Criteria

**Governing jurisdiction: Duluth.** A "Duluth, GA" mailing address is usually NOT in the City of Duluth. Unincorporated Gwinnett is 67.3% of the county's land area and is governed by a different code, a different board and a different permit portal. Resolve the governing jurisdiction before answering any zoning question.


- **Article:** 8 — Environmental Protection
- **Pages in source:** 228–229
- **Adopted:** 2025-09-08
- **Amended through:** 2026-07-13
- **Source:** https://www.duluthga.net/UDC_ADOPTED_9.8.2025_Amended_7-13-26.pdf

## Text

1. No construction may proceed on a building or manufactured home to be served by a septic tank unless
the Gwinnett County Environmental Health Department first approves the proposed septic tank
installations as meeting the requirements of the Georgia Department of Human Resources’ Manual for
On-Site Sewage Management Systems (hereinafter DHR Manual), and Section 825(2) and Section 825(3),
below.
2. New homes served by a septic tank/drain field system shall be on lots having minimum size limitations as
follows, based on application of Table MT-1 of the DHR Manual (hereinafter DHR Table MT-1). The
minimums set forth in Table MT-1 may be increased further based on consideration of other factors, as
set forth in Sections A-F of the DHR Manual.

227 | P a g e

Article Eight. Environmental Protection

a. 150% of the subdivision minimum lot size calculated based on application of DHR Table MT-1 if

they are within a high pollution susceptibility area;
b. 125% of the subdivision minimum lot size calculated based on application of DHR Table MT-1 if

they are within a medium pollution susceptibility area;
c.
110% of the subdivision minimum lot size calculated based on application of DHR Table MT-1 if
they are within a low pollution susceptibility area.
3. New manufactured home parks served by septic tank/drain field systems shall have lots or spaces having
minimum size limitations as follows, based on application of Table MT-2 of the DHR Manual (hereinafter
DHR Table MT-2). The minimums set forth in Table MT-2 may be increased further based on consideration
of other factors, as set forth in Sections A-F of the DHR Manual.

a. 150% of the subdivision minimum lot or space size calculated based on application of DHR Table

MT-2 if they are within a high pollution susceptibility area;
b. 125% of the subdivision minimum lot or space size calculated based on application of DHR Table

MT-2 if they are within a medium pollution susceptibility area;
c.
110% of the subdivision minimum lot or space size calculated based on application of DHR Table
MT-2 if they are within a low pollution susceptibility area.
4. New agricultural waste impoundment sites shall be lined if they are within a high pollution susceptibility
area; a medium pollution susceptibility area and exceed 15 acre-feet; or a low pollution susceptibility area
and exceed 50 acre-feet. As a minimum, the liner shall be constructed of compacted clay having a
thickness of one-foot and a vertical hydraulic conductivity of less than 5 x 10-7cm/sec or other criteria
established by the Natural Resource and Conservation Service.
5. New above-ground chemical or petroleum storage tanks, having a minimum volume of 660 gallons, shall
have secondary containment for 110% of the volume of such tanks or 110% of the volume of the largest
tank in a cluster of tanks. Such tanks used for agricultural purposes are exempt, provided they comply
with all federal requirements.
6. New facilities that handle hazardous materials of the types listed in Section 312 of the Resource
Conservation and Recovery Act of 1976 (excluding underground storage tanks) and in amounts of 10,000
pounds or more on any one day, shall perform their operations on impervious surfaces and in
conformance with any applicable federal spill prevention requirements and local fire code requirements.
7. Permanent storm water infiltration basins shall not be constructed in areas having high pollution
susceptibility.