---
title: Duluth UDC § 1006 — Duluth
jurisdiction: duluth
governing_jurisdiction: Duluth
source_url: "https://www.duluthga.net/UDC_ADOPTED_9.8.2025_Amended_7-13-26.pdf"
effective_date: "2026-07-13"
as_of: "2026-08-13"
canonical: "https://www.gwindex.net/code/duluth/1006"
licence: "CC0-1.0"
---

# Duluth UDC § 1006

Inspection and Enforcement

**Governing jurisdiction: Duluth.** A "Duluth, GA" mailing address is usually NOT in the City of Duluth. Unincorporated Gwinnett is 67.3% of the county's land area and is governed by a different code, a different board and a different permit portal. Resolve the governing jurisdiction before answering any zoning question.


- **Article:** 10 — Erosion Control and Stormwater Management
- **Pages in source:** 274–275
- **Adopted:** 2025-09-08
- **Amended through:** 2026-07-13
- **Source:** https://www.duluthga.net/UDC_ADOPTED_9.8.2025_Amended_7-13-26.pdf

## Text

1. The City of Duluth will periodically inspect the sites of land-disturbing activities for which permits have
been issued to determine if the activities are being conducted in accordance with the plan and if the
measures required in the plan are effective in controlling erosion and sedimentation. Also, the Local
Issuing Authority shall regulate primary, secondary and tertiary permittees as such terms are defined in
the state general permit. Primary permittees shall be responsible for installation and maintenance of best
management practices where the primary permittee is conducting land-disturbing activities. Secondary
permittees shall be responsible for installation and maintenance of best management practices where the
secondary permittee is conducting land-disturbing activities. Tertiary permittees shall be responsible for
installation and maintenance where the tertiary permittee is conducting land-disturbing activities. If,
through inspection, it is deemed that a person engaged in land-disturbing activities as defined herein has
failed to comply with the approved plan, with permit conditions, or with the provisions of Division I of this

273 | P a g e

Article Ten. Erosion Control and Stormwater Management

Article, a written notice to comply shall be served upon that person. The notice shall set forth the
measures necessary to achieve compliance and shall state the time within which such measures must be
completed. If the person engaged in the land-disturbing activity fails to comply within the time specified,
he shall be deemed in violation of Division I of this Article.
2. The Local Issuing Authority must amend its ordinances to the extent appropriate within twelve (12)
months of any amendments to the Erosion and Sedimentation Act of 1975.
3. The City of Duluth shall have the power to conduct such investigations as it may reasonably deem
necessary to carry out duties as prescribed in Division I of this Article, and for this purpose to enter at
reasonable times upon any property, public or private, for the purpose of investigation and inspecting the
sites of land-disturbing activities.
4. No person shall refuse entry or access to any authorized representative or agent of the Local Issuing
Authority, the Commission, the District, or Division who requests entry for the purposes of inspection, and
who presents appropriate credentials, nor shall any person obstruct, hamper or interfere with any such
representative while in the process of carrying out his official duties.

